Loomis – Ontario, CA | EV Fast Charger Installation
New fast charger installation at the
Loomis site, completed under contract
with XOS, the charger infrastructure
provider, supporting expanded EV
charging capabilities.
Davis Water Plant - Davis, CA – 800 kW Ground-Mount Solar Repowering
Repowering of an 800 kW ground-mounted solar
system, including reconfiguration of AC and DC
cable trays, equipment pads, and the replacement of
a burned-out transformer to restore system reliability
and performance.
CarMax - Burbank, CA – Tenant Improvement
ProjectTenant improvement project at the CarMax
Burbank facility, including the addition of a new
conference room and supporting electrical scope to
accommodate operational and workspace
enhancements.
Walmart – Arizona | Solar Array Repair After Tornado Damage
Following a tornado event that caused significant damage to the
solar installation, SEPIA Energy performed comprehensive solar
repair services at the Walmart facility in Arizona. Scope of work
included the removal of all damaged solar panels and
reconfiguration of the solar array, allowing the system to continue
operating safely and efficiently.
Madera Burned Solar Site Repair
Wal-Mart Covina /Decommissioning 500 Kw
Marina Ford - New Installation of 2 DCFC and 6 L2 EVSE
Tesla Service Centers- Lift upgrade and TI
AVHS-Re Powering 500 Kw Carport Upgrading a central Inverter to 17 string inverters and 1363 optimizers
Public Storages SoCal- Solar Installations
CarMax - Replacing Light poles and Installing LED Lighting
Marina Honda
Macy’s Store- Solar Demo
PepisCo - Retrofit EV charging
Joint Force Los Alamitos - Replacing 22,000 MC connectors